CDM twin-shaft cement mixing rigs JB80
CDM twin-shaft cement mixing rig JB80 (walking)
- Rated power
- 18.5kW
- Operating weight
- 42t
Hydraulic walking piling frames JZB240
42 m mast for ZLD180/850-3A drilling rigs or diesel hammers; 710 kN max. extraction force; about 142 t total weight.
| Max. drilling rig model | ZLD180/850-3A |
|---|---|
| Max. extraction force (full mast)(kN) | 710 |
| Main winch (drill rig, diesel hammer) single-line pull(kN) | 120 max |
| Main winch rope speed(m/min) | 0–26 |
| Main winch rope diameter(mm) | Φ22 |
| Main winch rope capacity(m) | 550 |
| Auxiliary winch (erection, drill rod, pile) single-line pull(kN) | 45 max |
| Auxiliary winch rope speed(m/min) | 0–32 |
| Auxiliary winch rope diameter(mm) | Φ22 |
| Auxiliary winch rope capacity(m) | 320 |
| Electric motor power(kW) | 45+30 |
|---|---|
| Hydraulic system pressure(MPa) | 25/18 |
| Hydraulic control | 手动控制 · Manual |
| Mast length(m) | 42 |
|---|---|
| Mast tube diameter(mm) | Φ920 |
| Mast guide rail centre distance(mm) | 600×Φ102 |
| Mast angle adjustment (left/right)(°) | ±1.5 |
| Brace cylinder stroke(mm) | 2800 |
| Mast fine-adjust cylinder stroke(mm) | 400 |
| Platform slewing angle(°) | ±10 |
| Lateral travel speed(m/min) | <4 |
| Lateral step length(mm) | 3000 |
| Longitudinal travel speed(m/min) | <2 |
| Longitudinal step length(mm) | 600 |
| Frame jacking speed(m/min) | <0.6 |
| Frame jacking height(mm) | 600 ~ -600 |
| Shoe gauge (working / moving)(mm) | 9000 / 5000 |
| Wheel track (working / moving)(mm) | 5000 / 4900 |
| Lateral shoe (length × width)(mm) | 10000 × 1300 |
| Longitudinal shoe (length × width)(mm) | 6600 × 1600 |
| Outrigger beam connection | 销轴回转、油缸扩伸 · Pin slewing, cylinder extension |
| Ground pressure(MPa) | ≤0.1 |
| Total weight(t) | ≈142 |
* Specifications vary by configuration. The contract and factory documents prevail.
Documents are being prepared. Contact us to request them.
Warranty: as stated in the contract.
Parts: common parts stocked in Vietnam, urgent parts shipped first.
On site: commissioning, operator training, regular inspections.
Rental: monthly, or priced per pile metre by project.